Solvent Extraction Plant
Freezone Enclave Tema Greater Accra Ghana
Client: Wilmar Africa
Contract Sum: $1.6M
A combination of steel and reinforced concrete structure complete with steel roof trusses and aluminium sheet roofing and cladding. The project started in November 2010 and was handed over in May 2011.
One of the major challenging issues is the process for setting out the series of reinforced conctrete machine plinths, apertures and trenches. The plinths provide support for machinery held down by steel bolts. This means that holding down bolts had to be cast into exact positions within the concrete plinths.
In completing this project, extensive use of Total station was employed in the setting out process.
Steel design and fabrication was carried out by Kumar Steel India. Extensive
coordination took place between Dartwood & Kumar during the life of the project. The use of RFI (Request For Information) ensured that all queries and answers were properly documented in chronological order.
Unlocking Productivity